|
Summary
|
Description
|
Cost
|
|
Print Revision Code on the Indented Bill of Materials Report (BM0003) |
Print the revision code on the Indented Bill of Materials report. |
$100 |
|
Operation Code Comments (BM0004) |
Add a comment line to all operation code sequences. The comment prints on selected reports. |
$275 |
|
Indented Bill of Material Printing restriction (BM0005) |
Restrict displaying the cost to operators with a security level of 8 or higher. |
$175 |
|
Copy Bill of Material to another Firm. (BM0006) |
Allows for a complete copy of a BOM from one firm to another. All items are assumed to exist in the destination firm. |
$225 |
|
BOM Material Comments (BM0008) |
Add an option to enter comments for the Bill Of Material components. |
$175 |
|
Operation Code Overhead (BM0010) |
Add Fixed or Percentage processing to each Operation Code. |
$350 |
|
BOM Obsolete Part Processing (BM0011) |
After entering an item number and obsolete date, all BOM's are searched and the items are set as obsolete on the entered date. |
$175 |
|
Component Sales Forecast (BM0012) |
Option to enter a single component item and date. A display of the BOM that contains the item and the previous 12-months usage will be displayed. There is a printed version of this Feature that offers ranges. |
$275 |
|
BMM Entry Logging (BM0013) |
This feature creates a text file of changes made to Bill of Materials with who and when information incase changes need to be tracked. |
$250 |
|
Indented BOM Product Filter (BM0014) |
Add a Product Type Filter option to the Indented Bill Of Materials Report. |
$75 |
|
BOM Time Display (BM0015) |
Display the total time and operations involved for a Bill of Material |
$75 |